← Back to Modifications

Modifications

20' HAZMAT Storage Non Insulated

Secure, reliable storage for hazardous materials and chemicals. Built for safety, compliance, and durability in demanding environments.

20' HAZMAT Storage - Non Insulated

Features

  • 1900L containment capacity for hazardous materials
  • Full open-side access for easy loading and unloading
  • Heavy-duty 1-¼” bar grating floor: 1) Safe for walking, 2) Suitable for storing drums and materials
  • Integrated secondary containment system for spill control
  • Passive ventilation system ensures proper air circulation
  • Durable, industrial-grade construction for demanding environments

Specifications

  • Container 20’ Standard Height Open Side (Bi-fold)
  • Size 20’ L × 8’ W × 8’6” H (OTU)
  • Model TBD
  • Side Access Full-length bi-fold doors (entire 20’ side opens)
  • Ventilation 12 × Big Air 45 louvered vents (9” × 14”)
  • Secondary Containment 6” deep galvanized pans with 1-¼” smooth bar grating

Packages

Explosion-Proof Electrical (Class 1, Div 1) Interior junction box, switch, and lights.

Contact Us

Starting Price

+ applicable taxes and delivery

$24,900.00

Add Ons

$1,200.00
$1,100.00
$2,370.00
$5,900.00
$4,100.00
$11,000.00
Add On Price Total: $0.00
Final Total Price: $24,900.00

Printable Estimate

Disclaimer: Prices listed are estimates only. The Container Guy reserves the right to adjust final pricing based on market conditions, project requirements, and final order scope. Please contact us for an official quote.

Build Expectations

Pre-engineered mods still need a confirmed scope.

Standardized and pre-engineered builds are designed to be repeatable, but the final quote still depends on branch logistics, selected options, code requirements, delivery, and site conditions.

01

50 percent deposit

Modification projects normally require a 50 percent deposit to start the build and the remaining 50 percent before delivery or release, unless an approved written term or applicable consumer rule requires a different process.

02

Built to confirmed scope

Custom and pre-engineered modification builds are not change-of-mind returnable once the scope is approved and work begins, unless a return, cancellation, or change term is negotiated in writing.

03

Changes affect the quote

After approval, changes to layout, options, delivery, access, electrical, HVAC, or regulatory scope can affect price and timeline.

04

Rentals are inquiry-based

Some builds may be rentable depending on branch inventory, term, delivery area, and fleet allocation. Availability is confirmed by request.